|PHASE 2| NEW CONSTRUCTION

9 Mar

The funky around the sewer pipe framing.

Completed tasks.

  • Re-framed all walls (mix of metal and wood where needed for structure)
  • Reinforced framing for new wall hung sink
  • Framed out new shower
  • Ran new wiring to lights and add new GFI protected circuit for outlets
  • Ran all new PEX plumbing
  • Installed new Exhaust Fan and vented to exterior
  • Installed insulation and Vapor barrier
  • Installed mold resistant sheet rock on walls
  • Install Cement Board in shower
  • Taped, installed corner bead, Spackled and sanded to smooth finish
  • Installed tongue and grove wood ceiling

Starting to put things back.

My first header!! Over what will be the pocket door.

New studs, electric, water, gas, dryer vent and washer drain. Phew. Oddly, I sort of missed being able to see through walls when the drywall went up...


Photo by Harrison from the basement stairs. Putting things back.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: